Project Summaries: West Lynn

With beautiful views of Mount Hood, this three-story West Linn home had plenty going for it, but the primary suite needed a fresh approach. Menlo Construction worked with the homeowners to rethink the bathroom layout, creating a more functional and comfortable space while updating the finishes throughout the suite.

The project extended well beyond the primary suite, with new flooring installed across approximately 3,000 square feet on three floors. Coordinating a renovation of this size in an occupied home required careful planning, scheduling, and attention to how the work affected the homeowners’ daily lives.

Throughout the renovation, we looked for opportunities to preserve and reuse existing materials rather than replace them unnecessarily. Original baseboards were carefully salvaged and color-matched, an existing closet door was repurposed, and new finishes were selected to complement the home’s established style.

From developing the bathroom design to coordinating the flooring installation and completing the finishing details, Menlo Construction brought the different elements of this renovation together. The result is a home that feels more cohesive, with a primary suite designed around the homeowners’ needs and thoughtful updates that work with what was already there.

Three-Story Home Renovation & Primary Suite Transformation

Whole-Home Flooring Renovation

  • Replaced flooring throughout all three levels of the home, encompassing approximately 3,000+ square feet.
  • Carefully removed and preserved original baseboards at the homeowner’s request.
  • Reinstalled salvaged baseboards wherever possible.
  • Sourced and installed additional baseboards where needed, carefully color-matching the existing woodwork to maintain a consistent appearance throughout the home.
  • Integrated new and salvaged trim on the third floor, which includes the home office and primary suite.

Primary Bathroom Design & Complete Reconfiguration

  • Developed the bathroom’s new layout and design in-house, working with the homeowners to create a more functional and updated primary suite.
  • Removed a dated Jacuzzi tub and reimagined the space to accommodate both a walk-in shower and a separate soaking tub.
  • Reconfigured the bathroom layout to improve functionality and use of space.
  • Constructed a pony wall to define the new shower area.
  • Built a custom walk-in shower featuring:
    • Custom glass shower enclosure
    • Linear shower drain
    • Built-in custom shower niches
    • Large-format white wall tile
  • Installed new hexagonal floor tile.
  • Installed a separate soaking tub.
  • Installed a new vanity with quartz countertop.
  • Installed two new mirrors and updated bathroom lighting.

Custom Walk-In Closet Construction

  • Redesigned the primary suite’s original open-concept closet arrangement, which featured closets along the walls.
  • Framed and constructed a spacious, enclosed walk-in closet to create a more organized and visually streamlined bedroom.
  • Installed new walls and interior finishes to define the closet space.
  • Installed shelving and hanging rods for clothing storage.
  • Installed a new pocket door to maximize usable space and provide a clean transition between the bathroom area and closet.
  • Integrated new baseboards and trim to match the home’s existing woodwork.

Private Water Closet Addition

  • Reconfigured the existing bathroom layout to create a separate, enclosed water closet.
  • Rotated the toilet 180 degrees to accommodate the new configuration.
  • Framed and finished new walls to create a dedicated toilet room.
  • Repurposed an original closet door for the new water closet, preserving existing materials and maintaining architectural continuity.

Architectural Trim Preservation & Finish Carpentry

  • Carefully salvaged original baseboards during demolition and reconfiguration.
  • Reused existing trim in the redesigned primary suite wherever practical.
  • Installed additional color-matched baseboards to blend seamlessly with the original woodwork.
  • Preserved and repurposed an existing interior door rather than replacing it with a new one.
  • Maintained consistent trim details throughout the remodeled third floor.

Primary Bedroom Improvements

  • Updated lighting in the primary bedroom.
  • Completed finish carpentry and trim work to create a cohesive primary suite.

Project Design & Management

  • Provided in-house design and space planning for the primary bathroom and suite reconfiguration.
  • Managed a large-scale flooring renovation spanning three levels of the home.
  • Coordinated bathroom remodeling, plumbing relocation, custom shower construction, glass installation, tile work, framing, lighting, and finish carpentry.
  • Balanced extensive modernization with the homeowners’ desire to preserve original architectural details.
  • Created a more functional and private primary suite with dedicated spaces for bathing, clothing storage, and the toilet.

This remodel has been featured on the site a few times and can be found on this post about shower drains, this post about questions to ask yourself before a bathroom remodel, and here on our portfolio page.