Project Summaries: Brooklyn Neighborhood

This was a substantial, whole-home renovation that went well beyond a typical kitchen or bathroom remodel. The project involved opening nearly every wall and ceiling on the main floor, updating electrical and mechanical systems, rebuilding interior finishes, and bringing multiple rooms together into a cohesive, finished space.

As with many older Portland homes, the goal was to modernize the space without losing the details that give it character. We preserved the original two-piece window casings, reinstalled existing doors, and selected baseboards that complemented the home’s architectural style. From demolition through the finishing touches, Menlo Construction coordinated the trades, scheduling, and details, giving the homeowners one team to work with throughout the renovation. See full list below.

Whole-Home Main Floor Renovation

Demolition & Structural Modifications

  • Removed original lath and plaster from all walls and ceilings throughout the main floor.
  • Removed existing insulation from exterior walls.
  • Modified interior walls and door openings to accommodate a redesigned home office.
  • Removed deteriorated concrete and cracked tile from the fireplace hearth.
  • Carefully removed and stored existing interior doors for reinstallation following renovations.

Electrical, Lighting & HVAC

  • Coordinated extensive electrical rewiring throughout the main floor.
  • Installed updated lighting fixtures throughout the renovated spaces.
  • Rerouted HVAC ductwork to accommodate the new layout.

Insulation, Drywall & Wall Finishes

  • Installed new insulation in exterior walls.
  • Installed new drywall throughout the main floor, including walls and ceilings.
  • Applied smooth wall and ceiling finishes for a clean, updated appearance.

Home Office Conversion & Custom Carpentry

  • Converted an existing room into a dedicated home office.
  • Closed off an existing doorway and reconfigured access to the room.
  • Created a designated area for custom built-in shelving.
  • Installed new French doors connecting the office to the living room.

Historic Trim & Architectural Details

  • Carefully preserved the home’s original two-piece window casings.
  • Installed new two-piece baseboards throughout the main floor, maintaining the architectural character of the home.
  • Removed, protected, stored, and reinstalled existing interior doors.

Bathroom Renovation

  • Removed existing bathroom floor and wall tile.
  • Installed new bathroom floor tile and tiled wainscoting.
  • Installed a new shower door.
  • Installed a new vanity and mirror.
  • Updated bathroom lighting.

Fireplace & Chimney Restoration

  • Removed damaged tile and concrete from the existing fireplace hearth.
  • Installed new hearth tile.
  • Repaired deteriorated chimney mortar.

Flooring & Interior Painting

  • Installed new luxury vinyl plank (LVP) flooring throughout the main floor.
  • Painted walls, ceilings, and trim throughout the renovated first floor.

Exterior Entry & Porch Improvements

  • Repainted the front entry stairs.
  • Replaced the front porch guardrail and stair handrail.

Project Management & Trade Coordination

  • Managed a comprehensive main-floor renovation involving demolition, electrical, HVAC, insulation, drywall, finish carpentry, flooring, tile, painting, and exterior repairs.
  • Coordinated specialized trades and sequenced work across multiple areas of the home.
  • Balanced extensive modernization with preservation of the home’s original architectural details.